Luther Burbank Waterfront Construction this Summer

Starting in April, access to the Luther Burbank waterfront will be limited because of two important construction projects.

Luther Burbank South Shoreline Restoration Project

The first is the Luther Burbank South Shoreline Restoration Project, which will improve the trail along the lake. Some favorite destinations will be closed, including the fishing pier, the trail between the swim beach and the docks, and the access road between the waterfront and the meadow. Park visitors will be able to access the docks from the north by the playground. Project signage in the park will guide trail users during these closures. With completion of the project, trail users will be able to walk from the docks to the swim beach on an all-weather accessible trail. The old, eroded trail that is being undercut by wave action will be stabilized with the addition of spawning gravels and tree sections anchored into the shoreline. The old trail surface (shown below) will be replanted with native vegetation. Construction of this project is completely funded by the following sources:

  • Proposition No. 1 Parks Levy through King County Parks and Recreation
  • King Conservation District
  • King County Wastewater Treatment Division
  • King County Flood Control District/WRIA 8.

Boiler Building Stabilization

The second project is to stabilize the Boiler Building and retrofit it for modern standards. This work starts up in August and will continue through the fall. The 1928 steam plant will get a new roof, seismic reinforcements, and masonry repairs. The restrooms will also be completely renovated. These improvements will allow boating programming at the waterfront to continue. This project will not restrict access significantly, but there may be times when the waterfront plaza is closed.

The taxpayers of Washington State have contributed to the design of this project through a Department of Commerce Grant. A future phase of renovation will finish the interior of the building and provide direct, convenient access from the parking lot to complete the building's transition to a waterfront activity center for small craft boating programs.

Follow along here on Let's Talk for the latest updates on both of these important projects.

Share Luther Burbank Waterfront Construction this Summer on Facebook Share Luther Burbank Waterfront Construction this Summer on Twitter Share Luther Burbank Waterfront Construction this Summer on Linkedin Email Luther Burbank Waterfront Construction this Summer link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>