Construction Update for May 23

Progress has already been made since the Luther Burbank Park sport courts closed to the public on May 21. FieldTurf started site preparation and minor demolition this week, including:

  • Installing construction fencing and environmental protection measures such as compost socks and temporary catch basins;
  • Removing the chain link mesh from the south fence to prepare for paving access; and
  • Saw cutting existing asphalt at the court perimeter. (These sections of asphalt will be removed to accommodate new trench drains and electrical conduit as part of this project.)


Once court demolition is complete, FieldTurf will move on to excavating the south hillside and building the construction access path.


View construction photos here.

Share Construction Update for May 23 on Facebook Share Construction Update for May 23 on Twitter Share Construction Update for May 23 on Linkedin Email Construction Update for May 23 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>