Town Center Parking Project

Share Town Center Parking Project on Facebook Share Town Center Parking Project on Twitter Share Town Center Parking Project on Linkedin Email Town Center Parking Project link

In 2019, the City acquired property at 7810 SE 27th St, which includes a parking lot and small building that currently sits vacant due to its poor condition. As part of the City's efforts to best utilize this property for the community, the City is developing a surface parking lot to deliver vehicle and bike parking in Town Center. The project will also include new and widened sidewalks, improved pedestrian connections to the light rail and bus station, better lighting, and increased green and park space.

This page will provide background information, City Council meeting materials and presentations, and track the project through its completion.


In 2019, the City acquired property at 7810 SE 27th St, which includes a parking lot and small building that currently sits vacant due to its poor condition. As part of the City's efforts to best utilize this property for the community, the City is developing a surface parking lot to deliver vehicle and bike parking in Town Center. The project will also include new and widened sidewalks, improved pedestrian connections to the light rail and bus station, better lighting, and increased green and park space.

This page will provide background information, City Council meeting materials and presentations, and track the project through its completion.


  • Site Concept Approved by City Council

    Share Site Concept Approved by City Council on Facebook Share Site Concept Approved by City Council on Twitter Share Site Concept Approved by City Council on Linkedin Email Site Concept Approved by City Council link
    supporting image

    At the February 20 regular meeting, the City Council approved the site concept for the Town Center Long-Term Regional Transit Commuter Parking Project and directed the City Manager to proceed with design.

    The site concept includes the development of a surface parking lot to deliver commuter parking, and will include approximately 40 parking stalls, in addition to bike lockers, bike racks, and other amenities. The Commuter Parking Project site consists of three different parcels - including the former Tully’s Property - acquired and assembled over multiple years for the purpose of providing long-term regional transit commuter parking.

    This parking configuration maximizes use of space, while minimizing impact to the adjacent Greta Hackett Sculpture Gallery. There will be no net loss of green space and the project will result in a net reduction in hardscapes and impervious surfaces.

    Staff are proceeding with design and updated cost estimates as directed by the Council. Project bidding is anticipated in Q3/Q4 of 2024, with construction to immediately follow.

  • Council to Review Town Center Commuter Parking Site Concept

    Share Council to Review Town Center Commuter Parking Site Concept on Facebook Share Council to Review Town Center Commuter Parking Site Concept on Twitter Share Council to Review Town Center Commuter Parking Site Concept on Linkedin Email Council to Review Town Center Commuter Parking Site Concept link

    In 2017, the City entered into a settlement agreement with Sound Transit to offset local impacts of the East Link light rail project. As part of this agreement, $4.41 million was dedicated for long term regional transit commuter parking projects near the new Light Rail Station in Town Center.

    At the February 20 regular meeting, the City Council will review a recommendation and preferred site concept for a commuter parking project(External link) in the Town Center, presented by City Manager Jessi Bon. The Commuter Parking Project site consists of three different parcels, including the former Tully’s Property, acquired and assembled over multiple years for the purpose of providing long-term regional transit commuter parking.

    You can attend the February 20 council meeting(External link) in-person or virtually to watch the discussion.

  • Commuter Parking Development - Background Information

    Share Commuter Parking Development - Background Information on Facebook Share Commuter Parking Development - Background Information on Twitter Share Commuter Parking Development - Background Information on Linkedin Email Commuter Parking Development - Background Information link

    The City entered into a Settlement Agreement with Sound Transit on October 17, 2017 which provides $10.05 million toward projects to offset the impacts of the East Link light rail project. Included amongst those projects is $4.41 million to fund long-term regional transit commuter parking projects near the new Light Rail Station in Town Center. Upon execution of the Settlement Agreement, the City began working on plans to acquire and develop long-term regional transit commuter parking.

    Section 6 of the Sound Transit Settlement Agreement describes the 49/51 percent cost-share model related to the commuter parking project. Specifically, the Settlement Agreement will cover 49% of the costs for the commuter parking project and the City will cover 51%. The City’s 51% portion of the project contribution is intended to be achieved through a property match. Property Assemblage The Commuter Parking Project site consists of three different parcels acquired and assembled over multiple years to provide commuter parking in Town Center. The parcels include:

    • The “former Tully’s Site,” acquired in 2019, which includes the former coffee shop building and the associated parking lot.
    • Parcel A-1, which is owned by the City under a turnback agreement with the Washington State Department of Transportation from 2000. This parcel includes a portion of Sunset Highway and the cul-de-sac to the north of the former Tully’s property.
    • Parcel A-2, acquired in 2021, which is north of and immediately adjacent to Parcel A-1 and is part of what is known as the Greta Hackett Outdoor Sculpture Gallery in Aubrey Davis Park.

    The total property assemblage is just over 31,000 square feet and represents an important gateway to Town Center.

    At its meeting on June 5, 2018, the City Council authorized the City Manager to execute a Purchase and Sale Agreement to acquire the former Tully’s property, located at 7810 SE 27th Street, with the intent of combining this property with Parcel A-1 for the purpose of providing commuter parking. The former Tully’s property acquisition was completed in 2019 with a final purchase price of $2 million dollars. REET 1 funds were used for the acquisition. The City also purchased Parcel A-2 in December 2021 for $668,000 using REET 1 funds (see AB 5996).

    As part of the due diligence period and prior to finalizing the purchase of the former Tully’s Property, the City conducted an environmental site investigation due to the known soil contamination on the property. This due diligence period included an investigation to determine the vertical and horizontal extent of the contamination and to engage in negotiations with the former owner (ARC) responsible for the contamination from the former gas station on the property (BP/ARCO). A settlement agreement was executed in November 2019 between the City and ARC formalizing ARC’s responsibility to reimburse the City for costs related to site contamination investigation and cleanup. This includes 90% of costs arising from environmental investigation and assessment; 85% of costs arising from remediation of soil gas and groundwater contamination; and 100% of costs from excavation and disposal of contaminated soil at the former Tully’s Property and 75% of these costs at the A-1 parcel.

    The former Tully’s Coffee shop building and the associated parking lot are in poor condition. The parking lot does not meet City code and the building is stripped and inoperable. Most components of the building have failed or are at the end of their useful life. The building is currently used as transitional storage due to the City Hall closure – staff are working on cleaning out and fully abandoning the building. The building was under consideration for use as a satellite City facility, but the building is sited poorly and prevents efficient use of the property. Additionally, estimated costs to repair the building exceed the cost of replacement.

Page last updated: 12 May 2025, 08:37 AM