Construction Progress

The Parks team transported the new play equipment from the Public Works Shop to the construction site to be stored until it is installed in November. Equipment includes a 20' tall tower with two slides; a swing set with two belt swings; and free-standing play elements such as a log tunnel and mushroom steppers.