Luther Burbank Dock and Waterfront Renovations
The City is completing a years-long process to renovate the Luther Burbank Park waterfront. Built in 1974, the dock structures and adjacent waterfront have reached their useful life and need significant repairs to continue providing the public access to shoreline recreation.
Work to develop this project began in 2019, and the design is informed by the Luther Burbank Park Master Plan, which envisions the park's waterfront as a hub for small motorized and hand-powered watercraft activities. The project also considers accessibility and aesthetic improvements for a comprehensive site plan that, once executed, will expand access to Lake Washington for a variety of park visitors.
In 2024, the City completed seismic retrofits and other improvements to the Boiler Building and restroom/concession stand annex. Now preparations are underway to renovate the dock structures, North Beach, and waterfront plaza.
Construction of the next phase of improvements is anticipated to begin in fall 2026 and includes:
- Renovating the north pier, including replacing decking, jacketing creosote-timber piles, and repairing/replacing degrading piles to continue providing moorage access for large, motorized vessels (26’ and above).
- Replacing the central and south dock structures with a new wave attenuator/mooring float to serve small and mid-sized motorized vessels (below 26’) and special purpose float to serve non-motorized watercraft, including adding an ADA-accessible kayak launch.
- Installing a new ADA overwater platform off the plaza bulkhead to provide a stable surface where community members can enjoy shoreline activities and “get their feet wet.”
- Renovating the North Beach to provide ADA access to the water, including installing a new concrete pathway from the north bulkhead, installing an ADA beach mat to the water, and replacing non-native vegetation with new riparian and native plantings.
- Adding ADA pathway connections from the South Shoreline Trail and renovating the existing hidden path from the plaza to the playground with an ADA switchback trail and concrete stairs.
- Enhancing shoreline ecological functions with habitat gravel and lakebed cleanup.
- Upgrading sewer, electrical, stormwater, and irrigation utilities as well as installing a new fire suppression system to serve the docks and Boiler Building.
- Installing a new raw water intake system to enable the City to activate its water rights and draw water from Lake Washington to support park irrigation.
- Installing plaza improvements and amenities, including new surfacing, picnic tables/benches, signage, and the Mercer Island Medallions public art project.
Staff anticipate that construction will take 15 to 18 months to complete. Regular updates will be shared on Let's Talk once work begins, including information about park closures and impacts.
This project is funded in part by the Washington State Recreation and Conservation Funding Board, the U.S. Department of Fish and Wildlife, and the King County Flood Control District. The Washington State Department of Natural Resources leases the shorelands at no cost for public access to the waters of the State.
The City is completing a years-long process to renovate the Luther Burbank Park waterfront. Built in 1974, the dock structures and adjacent waterfront have reached their useful life and need significant repairs to continue providing the public access to shoreline recreation.
Work to develop this project began in 2019, and the design is informed by the Luther Burbank Park Master Plan, which envisions the park's waterfront as a hub for small motorized and hand-powered watercraft activities. The project also considers accessibility and aesthetic improvements for a comprehensive site plan that, once executed, will expand access to Lake Washington for a variety of park visitors.
In 2024, the City completed seismic retrofits and other improvements to the Boiler Building and restroom/concession stand annex. Now preparations are underway to renovate the dock structures, North Beach, and waterfront plaza.
Construction of the next phase of improvements is anticipated to begin in fall 2026 and includes:
- Renovating the north pier, including replacing decking, jacketing creosote-timber piles, and repairing/replacing degrading piles to continue providing moorage access for large, motorized vessels (26’ and above).
- Replacing the central and south dock structures with a new wave attenuator/mooring float to serve small and mid-sized motorized vessels (below 26’) and special purpose float to serve non-motorized watercraft, including adding an ADA-accessible kayak launch.
- Installing a new ADA overwater platform off the plaza bulkhead to provide a stable surface where community members can enjoy shoreline activities and “get their feet wet.”
- Renovating the North Beach to provide ADA access to the water, including installing a new concrete pathway from the north bulkhead, installing an ADA beach mat to the water, and replacing non-native vegetation with new riparian and native plantings.
- Adding ADA pathway connections from the South Shoreline Trail and renovating the existing hidden path from the plaza to the playground with an ADA switchback trail and concrete stairs.
- Enhancing shoreline ecological functions with habitat gravel and lakebed cleanup.
- Upgrading sewer, electrical, stormwater, and irrigation utilities as well as installing a new fire suppression system to serve the docks and Boiler Building.
- Installing a new raw water intake system to enable the City to activate its water rights and draw water from Lake Washington to support park irrigation.
- Installing plaza improvements and amenities, including new surfacing, picnic tables/benches, signage, and the Mercer Island Medallions public art project.
Staff anticipate that construction will take 15 to 18 months to complete. Regular updates will be shared on Let's Talk once work begins, including information about park closures and impacts.
This project is funded in part by the Washington State Recreation and Conservation Funding Board, the U.S. Department of Fish and Wildlife, and the King County Flood Control District. The Washington State Department of Natural Resources leases the shorelands at no cost for public access to the waters of the State.
-
City Receives BIG Grant for Luther Burbank Dock Renovation
Share City Receives BIG Grant for Luther Burbank Dock Renovation on Facebook Share City Receives BIG Grant for Luther Burbank Dock Renovation on X (formerly Twitter) Share City Receives BIG Grant for Luther Burbank Dock Renovation on Linkedin Email City Receives BIG Grant for Luther Burbank Dock Renovation link
The City of Mercer Island has been awarded a federal Boating Infrastructure Grant (BIG) to renovate the north pier at the Luther Burbank dock. The $379k grant is for both design and construction and covers 75% of the project costs. The City will contribute the remaining 25% match. This federal grant program is administered by the Washington State Recreation and Conservation Office (RCO) to develop and renovate boating facilities targeting guest recreational boats 26 feet and larger. The grant application was supported by Friends of Luther Burbank Park, Mercer Island Community Fund, Mercer Island Chamber of Commerce and the Recreational Boating Association of Washington. Construction will be coordinated with other elements of the overall project such as the new floating dock and shoreline access improvements. Construction is expected to be completed in 2024.
The City of Mercer Island has been awarded a federal Boating Infrastructure Grant (BIG) to renovate the north pier at the Luther Burbank dock. The $379k grant is for both design and construction and covers 75% of the project costs. The City will contribute the remaining 25% match. This federal grant program is administered by the Washington State Recreation and Conservation Office (RCO) to develop and renovate boating facilities targeting guest recreational boats 26 feet and larger. The grant application was supported by Friends of Luther Burbank Park, Mercer Island Community Fund, Mercer Island Chamber of Commerce and the Recreational Boating Association of Washington. Construction will be coordinated with other elements of the overall project such as the new floating dock and shoreline access improvements. Construction is expected to be completed in 2024.
-
Luther Burbank Dock Design Moves Forward
Share Luther Burbank Dock Design Moves Forward on Facebook Share Luther Burbank Dock Design Moves Forward on X (formerly Twitter) Share Luther Burbank Dock Design Moves Forward on Linkedin Email Luther Burbank Dock Design Moves Forward link
On May 18, Mercer Island City Council approved the recommended Concept Design for the Luther Burbank Dock and Adjacent Waterfront. City Council also appropriated the funding to move the design forward to the 30% stage, which will provide decision-makers cost and permitting analysis. The design includes an expanded beach area and bulkhead steps for improved shoreline access, and waterfront plaza renovations to address aging facilities there. The 30% design will be completed this summer and fall. The Parks and Recreation Commission will review preliminary design products before making its recommendations to City Council on how to proceed.
On May 18, Mercer Island City Council approved the recommended Concept Design for the Luther Burbank Dock and Adjacent Waterfront. City Council also appropriated the funding to move the design forward to the 30% stage, which will provide decision-makers cost and permitting analysis. The design includes an expanded beach area and bulkhead steps for improved shoreline access, and waterfront plaza renovations to address aging facilities there. The 30% design will be completed this summer and fall. The Parks and Recreation Commission will review preliminary design products before making its recommendations to City Council on how to proceed.
-
Parks and Recreation Commission Approves Concept Design
Share Parks and Recreation Commission Approves Concept Design on Facebook Share Parks and Recreation Commission Approves Concept Design on X (formerly Twitter) Share Parks and Recreation Commission Approves Concept Design on Linkedin Email Parks and Recreation Commission Approves Concept Design linkAt its April 1 meeting, the Mercer Island Parks and Recreation Commission approved a concept design for the Luther Burbank docks and adjacent waterfront. The Commission will forward its recommendation to Mercer Island City Council which is schedule to consider it at its May 18, 2021 meeting.
The main work product is a graphic plan which is accompanied by a list of the design elements giving more explanation.
This work product was the result of six meetings of the Commission and four meetings of its dock subcommittee. It calls for new floating docks that will serve small powerboats and non-motorized watercraft, an expanded beach area to the north of the plaza with ADA access to the shoreline, and plaza renovations that update the 47 year-old facility. Construction of these improvements is still several years away. Design will be completed in 2022 which enables the City to apply for state and local grants to support the construction. Even so, this comprehensive scope of work will likely be completed in phases as funding becomes available.
At its April 1 meeting, the Mercer Island Parks and Recreation Commission approved a concept design for the Luther Burbank docks and adjacent waterfront. The Commission will forward its recommendation to Mercer Island City Council which is schedule to consider it at its May 18, 2021 meeting.
The main work product is a graphic plan which is accompanied by a list of the design elements giving more explanation.
This work product was the result of six meetings of the Commission and four meetings of its dock subcommittee. It calls for new floating docks that will serve small powerboats and non-motorized watercraft, an expanded beach area to the north of the plaza with ADA access to the shoreline, and plaza renovations that update the 47 year-old facility. Construction of these improvements is still several years away. Design will be completed in 2022 which enables the City to apply for state and local grants to support the construction. Even so, this comprehensive scope of work will likely be completed in phases as funding becomes available.
-
Parks and Recreation Commission discusses the Draft Dock Plan
Share Parks and Recreation Commission discusses the Draft Dock Plan on Facebook Share Parks and Recreation Commission discusses the Draft Dock Plan on X (formerly Twitter) Share Parks and Recreation Commission discusses the Draft Dock Plan on Linkedin Email Parks and Recreation Commission discusses the Draft Dock Plan linkOn March 4, the Mercer Island Parks and Recreation Commission will take up the Luther Burbank Docks Draft Preferred Concept Plan developed by its three-member subcommittee. This draft plan includes schematic design of the new docks, proposed improvements to the cobble beach to the north of the docks, and proposed renovation of the plaza between the docks and the Boiler Building. The subcommittee considered environmental quality, intensity of use, congruence with the Luther Burbank Master Plan and the unique character of the site in developing this initial product. At the March 4 meeting, the Parks and Recreation Commission will review this product and provide the subcommittee input towards finalizing the plan.
In January 2021, the Commission appointed three members to form the Luther Burbank Docks Subcommittee. Commissioner Peter Struck was appointed as chair, with Commissioners Lyn Gualtieri and Rory Westberg as members. They have worked diligently at three meetings over the course of four weeks to develop this draft work product. Those interested in the project will want to take a look at the Draft Preferred Concept Plan and the Elements of the Draft Concept Plan documents, also available on the meetings webpage. An analysis of the preferred concept plan in comparison to the initial concept alternatives is also available. Comment on these products can be offered to the Commission by participating in the Publlic Appearances portion of the meeting agenda, by emailing paul.west@mercerisland.gov, or by leaving a comment on this project page.
On March 4, the Mercer Island Parks and Recreation Commission will take up the Luther Burbank Docks Draft Preferred Concept Plan developed by its three-member subcommittee. This draft plan includes schematic design of the new docks, proposed improvements to the cobble beach to the north of the docks, and proposed renovation of the plaza between the docks and the Boiler Building. The subcommittee considered environmental quality, intensity of use, congruence with the Luther Burbank Master Plan and the unique character of the site in developing this initial product. At the March 4 meeting, the Parks and Recreation Commission will review this product and provide the subcommittee input towards finalizing the plan.
In January 2021, the Commission appointed three members to form the Luther Burbank Docks Subcommittee. Commissioner Peter Struck was appointed as chair, with Commissioners Lyn Gualtieri and Rory Westberg as members. They have worked diligently at three meetings over the course of four weeks to develop this draft work product. Those interested in the project will want to take a look at the Draft Preferred Concept Plan and the Elements of the Draft Concept Plan documents, also available on the meetings webpage. An analysis of the preferred concept plan in comparison to the initial concept alternatives is also available. Comment on these products can be offered to the Commission by participating in the Publlic Appearances portion of the meeting agenda, by emailing paul.west@mercerisland.gov, or by leaving a comment on this project page.
-
Luther Burbank Docks Subcommittee
Share Luther Burbank Docks Subcommittee on Facebook Share Luther Burbank Docks Subcommittee on X (formerly Twitter) Share Luther Burbank Docks Subcommittee on Linkedin Email Luther Burbank Docks Subcommittee linkParks and Recreation Commission Subcommittee to Develop Draft Concept Plan
At its January 7, 2021 meeting, the Mercer Island Parks and Recreation Commission agreed to form a subcommittee to develop a draft concept plan for the Luther Burbank Dock Reconfiguration project. The committee will consist of three commissioners who will work with the City's design team to develop this product. The subcommittee will present draft products to the full commission for review. Once the commission approves a concept plan, it will be forwarded to City Council for consideration.
Commissioner Peter Struck will chair the subcommittee and will be joined by Commissioners Rory Westberg and Lyn Gualtieri. Four meetings are currently scheduled to complete this work. The full Parks & Recreation Commission is expected to review draft products at its March and April regular meetings.
See the Key Dates calendar on the right side of this page for scheduled meetings. Each meeting will be open to the public to observe and will be recorded and saved on the City Council's YouTube channel. The public can comment on any part of this process by posting on this project page.
Zoom links and phone access for each subcommittee meeting can be found on the City of Mercer Island Meetings Calendar and under Key Dates for each meeting on the menu to the right.
Parks and Recreation Commission Subcommittee to Develop Draft Concept Plan
At its January 7, 2021 meeting, the Mercer Island Parks and Recreation Commission agreed to form a subcommittee to develop a draft concept plan for the Luther Burbank Dock Reconfiguration project. The committee will consist of three commissioners who will work with the City's design team to develop this product. The subcommittee will present draft products to the full commission for review. Once the commission approves a concept plan, it will be forwarded to City Council for consideration.
Commissioner Peter Struck will chair the subcommittee and will be joined by Commissioners Rory Westberg and Lyn Gualtieri. Four meetings are currently scheduled to complete this work. The full Parks & Recreation Commission is expected to review draft products at its March and April regular meetings.
See the Key Dates calendar on the right side of this page for scheduled meetings. Each meeting will be open to the public to observe and will be recorded and saved on the City Council's YouTube channel. The public can comment on any part of this process by posting on this project page.
Zoom links and phone access for each subcommittee meeting can be found on the City of Mercer Island Meetings Calendar and under Key Dates for each meeting on the menu to the right.
-
Luther Burbank Docks - Open House Results Available
Share Luther Burbank Docks - Open House Results Available on Facebook Share Luther Burbank Docks - Open House Results Available on X (formerly Twitter) Share Luther Burbank Docks - Open House Results Available on Linkedin Email Luther Burbank Docks - Open House Results Available linkThanks to all who attended the Luther Burbank Docks Open House, either in-person or virtually. We received 131 survey responses. In addition, many people learned about the project for the first time or got a better sense of what the project encompasses.
A summary of the Open House with survey results is posted in the Document Library. The next step is for the Parks and Recreation Commission to consider these results and other information to develop a preferred alternative. The next meeting is tentatively planned for November 5.
Thanks to all who attended the Luther Burbank Docks Open House, either in-person or virtually. We received 131 survey responses. In addition, many people learned about the project for the first time or got a better sense of what the project encompasses.
A summary of the Open House with survey results is posted in the Document Library. The next step is for the Parks and Recreation Commission to consider these results and other information to develop a preferred alternative. The next meeting is tentatively planned for November 5.
-
Luther Burbank Docks - Open House Sept 2 - Oct 7
Share Luther Burbank Docks - Open House Sept 2 - Oct 7 on Facebook Share Luther Burbank Docks - Open House Sept 2 - Oct 7 on X (formerly Twitter) Share Luther Burbank Docks - Open House Sept 2 - Oct 7 on Linkedin Email Luther Burbank Docks - Open House Sept 2 - Oct 7 linkOPEN HOUSE EXTENDED THROUGH OCTOBER 7.
The City of Mercer Island is hosting a self-guided, socially-distanced open house at the waterfront in Luther Burbank Park starting Sept. 2 and running through October 7. Boaters and other waterfront users are invited to visit the park (following appropriate COVID-19 measures) and view an outdoor display of project alternatives presented on six posters. See the new concepts for the docks, shoreline and related facilities at the waterfront. After visiting the area, participants can fill out an online questionnaire or take home a paper copy to return to the city.
If you can't make it to the park, all the same information is available here on this webpage. The following links will download the posters that are displayed at the site.
If you need some background, start with the introductory posters. This page also has videos and other background materials that may be helpful.
The concept alternative posters are each a collection of ideas. They are meant to illustrate a range of options for various components of the docks and waterfront.
Alternative 1
Alternative 2
Alternative 3A table comparing the Alternatives to the existing facility is available as a "cheat sheet". Pick the ideas that you like best or come up with your own. Then take the online survey or download a paper survey which you can mail in or drop off at the drop box in the Mercer Island City Hall parking lot.
For more information, or to arrange a socially-distanced tour of the docks with the project manager, contact Paul West at paul.west@mercergov.org or (206) 275-7833.
OPEN HOUSE EXTENDED THROUGH OCTOBER 7.
The City of Mercer Island is hosting a self-guided, socially-distanced open house at the waterfront in Luther Burbank Park starting Sept. 2 and running through October 7. Boaters and other waterfront users are invited to visit the park (following appropriate COVID-19 measures) and view an outdoor display of project alternatives presented on six posters. See the new concepts for the docks, shoreline and related facilities at the waterfront. After visiting the area, participants can fill out an online questionnaire or take home a paper copy to return to the city.
If you can't make it to the park, all the same information is available here on this webpage. The following links will download the posters that are displayed at the site.
If you need some background, start with the introductory posters. This page also has videos and other background materials that may be helpful.
The concept alternative posters are each a collection of ideas. They are meant to illustrate a range of options for various components of the docks and waterfront.
Alternative 1
Alternative 2
Alternative 3A table comparing the Alternatives to the existing facility is available as a "cheat sheet". Pick the ideas that you like best or come up with your own. Then take the online survey or download a paper survey which you can mail in or drop off at the drop box in the Mercer Island City Hall parking lot.
For more information, or to arrange a socially-distanced tour of the docks with the project manager, contact Paul West at paul.west@mercergov.org or (206) 275-7833.
-
Luther Burbank Docks - Design Charrette Results Available
Share Luther Burbank Docks - Design Charrette Results Available on Facebook Share Luther Burbank Docks - Design Charrette Results Available on X (formerly Twitter) Share Luther Burbank Docks - Design Charrette Results Available on Linkedin Email Luther Burbank Docks - Design Charrette Results Available linkVideo, slides, notes, chat and polling from the Luther Burbank Park docks design charrette (held Aug 6) are now available here on Let's Talk. These become part of the meeting record and feed into the design alternatives that the design team will be developing over the next few weeks.
A link to the video, as well as the summary/notes, chat, polling and powerpoint slides are available in the right-hand column of this page in the Document Library. The meeting video and minutes are also posted to the City's Parks & Rec webpage.
Video, slides, notes, chat and polling from the Luther Burbank Park docks design charrette (held Aug 6) are now available here on Let's Talk. These become part of the meeting record and feed into the design alternatives that the design team will be developing over the next few weeks.
A link to the video, as well as the summary/notes, chat, polling and powerpoint slides are available in the right-hand column of this page in the Document Library. The meeting video and minutes are also posted to the City's Parks & Rec webpage.
-
Luther Burbank Docks - Design Charrette Set for August 6
Share Luther Burbank Docks - Design Charrette Set for August 6 on Facebook Share Luther Burbank Docks - Design Charrette Set for August 6 on X (formerly Twitter) Share Luther Burbank Docks - Design Charrette Set for August 6 on Linkedin Email Luther Burbank Docks - Design Charrette Set for August 6 linkThe City of Mercer Island invites boaters and other waterfront users to observe and participate in a virtual design charrette for the Luther Burbank Park docks on Thursday August 6 from 5:00 to 9:00 pm, using teleconferencing technology provided by Zoom. This workshop will discuss how the docks will be rebuilt in a new configuration, with an emphasis on serving small power, sail, and paddle craft. It will also explore ways to make the waterfront more accessible and attractive.
Luther Burbank Park is a very popular waterfront park especially during boating season. The docks at Luther Burbank Park are 46Continue reading
The City of Mercer Island invites boaters and other waterfront users to observe and participate in a virtual design charrette for the Luther Burbank Park docks on Thursday August 6 from 5:00 to 9:00 pm, using teleconferencing technology provided by Zoom. This workshop will discuss how the docks will be rebuilt in a new configuration, with an emphasis on serving small power, sail, and paddle craft. It will also explore ways to make the waterfront more accessible and attractive.
Luther Burbank Park is a very popular waterfront park especially during boating season. The docks at Luther Burbank Park are 46 years old and in need of major repairs. Instead of maintaining the current dock configuration, this project takes direction from the Luther Burbank Park Master Plan, which envisions a lively waterfront activity center focused on small boats. The plan calls for retaining/repairing one pier while replacing the other piers with lower floating docks for better boating access. Creating an accessible waterfront and shoreline for all users is part of the plan. The charrette is an extended interactive workshop that will explore the details of these features. Results from the charrette will be presented to the public for comment in late August.
This work is funded by the City of Mercer Island and a Boating Facilities Program Grant from Washington State. For questions, contact Paul West at 206.275.7833 or email paul.west@mercergov.org.
A Note About Registering to Speak: Individuals wishing to speak live during the public input portions of the design charrette are asked to notify Paul West at 206.275.7833 or email paul.west@mercergov.org and leave a message before 4 pm on the day of the workshop. Please reference "Luther Burbank Dock" in your correspondence. The moderator will call on you by name or telephone number when it is your turn to speak.
Join by Telephone at 5:00 pm: To listen to the meeting or speak live during public input via telephone, please call 253.215.8782 and enter Webinar ID 980 9512 6334 and Password 020977 when prompted. The moderator will call on you by name or the telephone number you provide when registering to speak. Please note, the phone number you provide must match the number you call in on. For meeting security, unrecognized numbers will not be granted access.
Join by Internet at 5:00 pm: To watch the meeting over the internet or speak live during public input, via your computer microphone, follow these steps:
1) Click this link
2) If the Zoom app is not installed on your computer, you will be prompted to download it.
3) If prompted for Webinar ID, enter 980 9512 6334) Enter Password 020977
4) The moderator will call on you by name or refer to your email address when it is your turn to speak. Please confirm that your audio works prior to participating.Submitting Written Comments: Written comments may be submitted at the Mercer Island Lets Talk Luther Burbank Dock page. Written comments received by 4:00 pm on August 6, 2020, will be read or summarized at the design charrette and become part of the project record on the Let’s Talk site.
For the safety and well being of the public and staff, the City strongly recommends that people attend the meeting by viewing the live feed using Zoom and join by Internet or phone using the link provided above.
In compliance with the Americans with Disabilities Act, those requiring accommodation for Council meetings should notify the City Clerk’s Office at least 24 hours prior to the meeting at 206.275.7793.
-
City Applies for Federal Boating Infrastructure Grant
Share City Applies for Federal Boating Infrastructure Grant on Facebook Share City Applies for Federal Boating Infrastructure Grant on X (formerly Twitter) Share City Applies for Federal Boating Infrastructure Grant on Linkedin Email City Applies for Federal Boating Infrastructure Grant linkThe City of Mercer Island has applied for federal grant funding through the Boating Infrastructure Grant Program to renovate the northern pier at the Luther Burbank Park waterfront. The 46 year old pier needs major structural repairs to remain functional. The project would also add moorage features to improve access for boaters.
The grant program is managed by the US Fish and Wildlife Service which evaluates the applications on a nationwide basis. If a grant is awarded, it would fund 75% of the design and construction costs. The renovation would likely take place in 2023 or 2024 because of long lead times for permits and coordination with other phases of the overall dock project.
This project has support from Friends of Luther Burbank Park, Mercer Island Community Fund, Mercer Island Chamber of Commerce and the Recreational Boating Association of Washington.
The City of Mercer Island has applied for federal grant funding through the Boating Infrastructure Grant Program to renovate the northern pier at the Luther Burbank Park waterfront. The 46 year old pier needs major structural repairs to remain functional. The project would also add moorage features to improve access for boaters.
The grant program is managed by the US Fish and Wildlife Service which evaluates the applications on a nationwide basis. If a grant is awarded, it would fund 75% of the design and construction costs. The renovation would likely take place in 2023 or 2024 because of long lead times for permits and coordination with other phases of the overall dock project.
This project has support from Friends of Luther Burbank Park, Mercer Island Community Fund, Mercer Island Chamber of Commerce and the Recreational Boating Association of Washington.
-
Scoping and Contracting
Luther Burbank Dock and Waterfront Renovations has finished this stage -
Condition Assessment and Public Input
Luther Burbank Dock and Waterfront Renovations has finished this stage -
Concept Plan
Luther Burbank Dock and Waterfront Renovations has finished this stage -
30% Design
Luther Burbank Dock and Waterfront Renovations has finished this stage -
Secure Funding
Luther Burbank Dock and Waterfront Renovations has finished this stageFinalize grant funding and budgets to enable construction.
-
Final Design and Permitting
Luther Burbank Dock and Waterfront Renovations is currently at this stage- Local, State, and Federal permitting.
- Complete design based on permitting outcomes.
- Bid project and authorize bid award.
-
Construction
this is an upcoming stage for Luther Burbank Dock and Waterfront Renovations2026-2027
-
Integrated Art Elements for Luther Burbank Waterfront (16.4 MB) (pdf)
-
MI Medallions for Donation.pdf (2.93 MB) (pdf)
-
LB Dock and Waterfront 60% Design.pdf (25.5 MB) (pdf)
-
LBP Docks and Waterfront 30% Design.pdf (16.5 MB) (pdf)
-
Recommended Concept Design
-
Draft Preferred Concept
-
Open House 02September2020
-
LBDR Overview posters.pdf (11.2 MB) (pdf)
-
LBDR Alternative 1.pdf (6.78 MB) (pdf)
-
LBDR Alternative 2.pdf (6.73 MB) (pdf)
-
LBDR Alternative 3.pdf (7.35 MB) (pdf)
-
LBDR Alternatives Comparison Table.docx (17.1 KB) (docx)
-
LBDR_Open House Survey_print version.pdf (278 KB) (pdf)
-
LBDR Open House survey report.pdf (1.26 MB) (pdf)
-
-
Design Charrette 06August2020
-
LBDR Design Charrette_Summary and Notes.pdf (189 KB) (pdf)
-
LBDR Design Charrette Introduction Powerpoint (1.86 MB) (pdf)
-
LBDR Design Charrette Docks Powerpoint (1.03 MB) (pdf)
-
LBDR Design Charrette Breakwater Powerpoint (1000 KB) (pdf)
-
LBDR Design Charrette Access Powerpoint (1.08 MB) (pdf)
-
LBDR Design Charrette Placemaking Powerpoint (1.24 MB) (pdf)
-
LBDR design charrette saved chat.pdf (128 KB) (pdf)
-
LBDR Design Charrette polling results.pdf (144 KB) (pdf)
-
-
LBDR Public Involvement Plan draft 20210511.pdf (282 KB) (pdf)
-
Luther Burbank Dock Reconfiguration Demand Analysis 010219 (588 KB) (pdf)
-
2018 Survey Data - All Responses with Open Ended Questions (210 KB) (pdf)
-
Luther Burbank Dock and Adjacent Waterfront 30% Plans.pdf (11.9 MB) (pdf)
-
Phone 206-275-7864 Email sarah.bluvas@mercerisland.gov