First Hill Park is a neighborhood park located at SE 32nd Street and 72nd Avenue SE. The park playground included a treehouse play structure and hillside slide installed in 2007. In 2025, the City will remove aging play equipment and replace it with a new climbing structure, swings, and free-standing play features. Old play area surfacing will be removed and replaced with new engineered wood fiber (EWF) surfacing, and new gravel will be installed to provide an accessible pathway from the main park entrance to the renovated play area and existing picnic table.
The renovated playground design was developed with the community in 2024, and construction is anticipated to take 3-4 months. Follow along here on Let's Talk for regular construction updates and photos.
First Hill Park is a neighborhood park located at SE 32nd Street and 72nd Avenue SE. The park playground included a treehouse play structure and hillside slide installed in 2007. In 2025, the City will remove aging play equipment and replace it with a new climbing structure, swings, and free-standing play features. Old play area surfacing will be removed and replaced with new engineered wood fiber (EWF) surfacing, and new gravel will be installed to provide an accessible pathway from the main park entrance to the renovated play area and existing picnic table.
The renovated playground design was developed with the community in 2024, and construction is anticipated to take 3-4 months. Follow along here on Let's Talk for regular construction updates and photos.
Please post your comment below; all comments will be considered as part of the public record. Be a good neighbor and keep your comments civil; please refer to our moderation policy for more details. If you have a question, please submit it through the Ask A Question tool for a staff response.
You need to be signed in to comment in this Guest Book. Click here to Sign In or Register to get involved
Page last updated: 02 Sep 2025, 03:51 PM
Project Timeline
Project Initiation
First Hill Park Playground Replacement has finished this stage
Site assessment
Playground equipment + vendor research
ADA upgrades evaluation
Community Survey #1
First Hill Park Playground Replacement has finished this stage
Open March 20-April 14, 2024
Share input on your slide and other equipment preferences as well as review two multi-level tower structures being considered for the playground.
Community Input Opportunity #2
First Hill Park Playground Replacement has finished this stage
Open June 20-July 8, 2024
The play equipment selection and site plan concept for First Hill Park Playground are now available for community review and comment! Review the site plan and read more about how community feedback shaped the design in this post.
After reviewing the site plan concept, share share comments on the proposed design and equipment here.
Finalize Design, Order Equipment, Secure Permits, and Engage Contractor
First Hill Park Playground Replacement has finished this stage
Q3 2024-Q3 2025
Playground Under Construction
First Hill Park Playground Replacement is currently at this stage
Q3-Q4 2025
Project Complete
this is an upcoming stage for First Hill Park Playground Replacement
Thank you for your contribution!