Construction Progress

During site demolition and grading, R&R Construction uncovered several concrete footings from play equipment installed before the pirate ship days. To ensure the new concrete curb and play area surfacing can be installed correctly, R&R removed some of the old footings. This photo shows R&R breaking up the concrete footing and removing it in pieces rather than trying to take it out intact.