    Construction Progress

    Concrete footing for the new spinner
    previous next
    Construction awareness signage posted on-site
    Site demolition
    New play equipment stored on-site
    Removing existing timber curb
    Completed site demolition
    Grading the site
    Uncovering old play equipment footings
    Trenching for play area curbing
    New drainage pipe
    Removing old concrete footings
    Marking locations for new play equipment
    Installing crushed rock subgrade
    Keying-in the drainage fabric
    New drainage connection
    Improving the existing stormwater outfall
    Drainage system
    Installing new play equipment posts
    Concrete footing for the new spinner
    Posts for new net climber
    Setting concrete forms for new play curb
    Renovated drainage ditch on 70th Ave SE
    Concrete and other construction activity on May 6
    Softening the slope on 70th Ave SE