Construction Progress

New cone spinner
previous next
Parking alternatives for Roanoke Park
Construction awareness signage posted on-site
Site demolition
New play equipment stored on-site
Removing existing timber curb
Completed site demolition
Grading the site
Uncovering old play equipment footings
Trenching for play area curbing
New drainage pipe
Removing old concrete footings
Marking locations for new play equipment
Installing crushed rock subgrade
Keying-in the drainage fabric
New drainage connection
Improving the existing stormwater outfall
Drainage system
Installing new play equipment posts
Concrete footing for the new spinner
Posts for new net climber
Setting concrete forms for new play curb
Renovated drainage ditch on 70th Ave SE
Concrete and other construction activity on May 6
Softening the slope on 70th Ave SE
Completed form for concrete curb
Prepping the site for concrete and other upcoming work
Concrete boom pump to pour curb
Observing concrete pour
Pouring concrete curbing
Compacting concrete
Poured concrete curb
Completed section of concrete curb
Posts for the new 2-5 play structure
Site progress on 05.30.25
Installing the Neptun Climber
New cone spinner
Roadway impacts on West Mercer Way on June 11
Installing the first layer of poured-in-place surfacing
PIP progress around the new swings
Site progress - 06.18.25
Finished PIP surfacing and picnic pad
Finished PIP surfacing
New parking area curb
New picnic tables
New bench
Trench drain setting
Adjusting the catch basin and drainage swale
New underdrain in drainage swale
Concrete form for parking area trench drain
Compost and topsoil restoration
New play area bench
Pouring ADA parking stall
Installing the new concrete sidewalk
New sidewalk and ADA parking stall
Temporary irrigation and fencing