    Construction Progress

    Asphalt paving on 09.30.24
    previous next
    After laying the hot mix, it is compacted using an asphalt roller.
    Replanting the south hill
    New handrailing for the gravel path
    Courts are open for play!
    Reduced construction zone
    New concrete sidewalk
    New nets and fences
    New perimeter fence
    Pouring concrete for net post footings
    Coring foundation holes for pickleball net and fence posts
    Installing temporary court markings
    Confirming court planarity
    Conducting a second flood test
    Paving the new asphalt overlay
    Paving the new asphalt overlay
    Paving the new asphalt overlay
    New asphalt patches
    Completing the new asphalt overlay
    Making paving corrections
    Making paving corrections
    Making paving corrections
    Making paving corrections
    Refreshing the existing gravel path
    String test to investigate planarity
    Confirming court drainage
    Conducting a flood test
    Completed asphalt paving
    Asphalt paving on 09.24.24
    Asphalt paving on 09.30.24
    Asphalt paving on 09.30.24
    Asphalt paving on 09.30.24
    Asphalt paving on 09.24.24
    Asphalt paving on 09.24.24
    Asphalt paving on 09.24.24
    Subgrade remediation progress 09.18.24
    Proof-rolling the base aggregate
    Trenching for a new drain pipe on the south edge
    Compacting crushed rock subgrade
    Monitoring excavation and backfill
    Subgrade remediation progress 09.13.24
    New crushed rock subgrade in northwest quadrant
    Testing subgrade after excavation
    Compacting new crushed rock
    Placing new crushed rock subgrade
    Marking sections for grading
    Excavating weak subgrade
    Removing existing asphalt
    Removing existing asphalt
    Patching sawcut sections with new asphalt
    Patching sawcut sections with new asphalt
    Concrete setting for ACO trench drain system
    Pouring concrete for trench drain system
    Installing trench drain system
    New ACO trench drain system
    Investigating stormwater infrastructure
    Installing conduit
    Backfilling electrical trenches
    Construction progress 06.13.24
    Excavating the south hill
    Removing tennis net posts
    Removing sawcut asphalt
    Construction access road
    Site visit on 06.12.24
    Excavating the south hill
    Removing sawcut asphalt
    Sawcutting concrete patches
    Sawcutting around the perimeter
    Fence removal
    Construction signage