Construction Progress
The existing path from restroom building to the courts is getting a refresh as part of this project. FieldTurf removed the old gravel and weeds as well and regraded the slope. Fresh gravel and a new handrail will be installed; when connected to the new concrete sidewalk, an accessible route will run from the restrooms to the parking lot.